Permits and zoning
The paperwork between your lot and a permit
Most of what stops a cottage is paper: a setback, a coverage limit, a missing drawing. We handle that paper. We read the zoning, draw the plan set, submit it and answer the city's comments, and you sign what has to be signed.
Included
The zoning review for your zone district
A site plan on your plat
Floor plans, elevations and structural details
The permit application, submitted under our license
Answers to the city's plan review comments

What changes the cost
What moves the price of this job
What moves the cost of the paperwork.
A survey
A recent survey makes the site plan quick. Without one, we may need to commission one.
Engineering
Some foundations and framing need an engineer's stamp.
The city's comments
A plan can need one round of changes, or several. Each is part of the design agreement.
Reviews beyond the city's
A historic district or an association adds its own.
Not included: the city's fees, a survey if your lot needs one, and engineers' stamps
How it goes
The stages
- 01
Step 1: 1. Zoning review
Read the code for your zone and the plat for your lot.
- 02
Step 2: 2. Site plan and drawings
Drawn to the code and your wishes.
- 03
Step 3: 3. Submission
The permit application goes in under our license.
- 04
Step 4: 4. City comments
We answer each one, and tell you when it changes the scope.
- 05
Step 5: 5. Permit in hand
Then the build agreement.
Permits and rules
Who pulls the permit
We pull the building permit under our contractor license, and each utility permit with the trade that does the work. You sign what is the owner's to sign.
The city's plan review has its own clock. We tell you where your plans stand and what the city has asked.
Questions
Questions about permits and zoning
Do you do the drawings yourselves?
Our designer draws the plans, with an engineer where the code needs one.
Do I pay before the permit comes?
The design agreement has its own fee, stated before any drawing starts. The build is a separate agreement.
What if the city says no?
Then we look at what it would take to say yes: a smaller plan, a different spot on the lot. We tell you before spending more.
Is the house built before 1978?
It matters for the build, not for the permit. We note it in the plans, and we follow the lead-safe rule where it applies.
Ready to find out?
The lot check comes first, and it commits you to nothing.