Skip to content
Planning spring starts now: a lot check in winter leaves time for permit review.
Monday – Friday: 7:30 a.m. – 4:30 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7:30 a.m. – 4:30 p.m.General contractor · CO Lic. no. 000000(720) 555-0103

Pricing

How a cottage is priced

  • What decides the price

    A small house costs more per square foot than a big one, because the kitchen, bath and utilities don't shrink with it. The lot check tells us which of these apply to you.

    • Size, and how many stories

    • The utility run: distance, depth and what is in the way

    • The slab, foundation or garage structure we start from

    • Access: an alley, a gate, a crane or hand-carried lumber

    • Finishes, and how many windows and doors

  • What the estimate includes, and what it doesn't

    The estimate lists site work, structure, the envelope, systems and finishes, each with its scope and allowances.

    • Included: scope by line, named allowances, who is on site, how long each stage runs

    • Not included: city fees, utility connection fees, survey and soil work, landscaping, furniture

  • The lot visit

    Two of us, about an hour, after the desk check. Clear a path to the back of the lot and the garage, and tell us who will live in it.

  • The design agreement

    Drawings and the permit application are a separate, written agreement with their own fee. We tell you that fee before any drawing starts.

  • When you get the number

    In writing, after the drawings. A build price is firm for the period it names. Anything the drawings can't show, like what is under a slab, is an allowance, and we say so.

  • Payments

    Written into your contract and tied to stages of the work, not to dates. We follow Colorado rules on deposits. The last payment is due after the walk-through.

No prices here: the lot sets them, and the lot check is how we find out.

Inside the estimate

The five lines of every estimate

Every estimate has the same five lines, so two of them are easy to compare.

  • Site and utilities

    Locates, trenching, the sewer, water and power connections, drainage and the foundation.

  • Structure

    Framing, floors, walls and roof, and anything the existing garage needs to carry the plan.

  • Envelope

    Roofing, siding, windows, doors and insulation.

  • Systems

    Electric, plumbing, heating and cooling, with the permits and inspections each one needs.

  • Finishes

    Floors, cabinets, tile, paint and fixtures, as allowances you choose from.

Borrowing

Paying for it

We don't arrange loans. These are the common routes, and the estimate is yours to bring to your bank.

  • Savings

    Pay by stages, as the contract sets them.

  • A loan against your house

    Your bank or credit union will want the estimate and the drawings. Ask them early, before the design agreement.

  • A construction loan

    It pays out in stages and often has its own inspections. Ask your lender how it matches our payment stages.

Why no averages

We don't print an average

An average is a number nobody has paid. A short sewer run to a garage and a long run to the back of a deep lot aren't the same job, even when the buildings are the same size.

So we print what moves the price, and we put the number in writing after the drawings. If a figure here would help you decide whether to call, the lot check is the place to start.

Ask for the lot check

It comes first, and the design fee is quoted before any drawing.