How it works

From a lot check to the keys

Seven steps. You sign nothing until step three, and you pay for nothing until you've seen what it buys.

  1. 01

    Step 1: 1. The lot check

    We read the zoning, the plat and the utility maps for your address and write back.

  2. 02

    Step 2: 2. A walk on the lot

    Two of us, about an hour. We look at the garage, the yard, the alley and the meters, and we ask who will live there.

    Gloved hands marking a wood plank with a pencil beside a tool case
  3. 03

    Step 3: 3. The design agreement

    A written agreement for drawings and the permit application, with its fee stated before anything starts.

  4. 04

    Step 4: 4. Drawings and permit

    We submit the plans and answer the city's comments. Plan review is the city's clock, and it sets the start date.

  5. 05

    Step 5: 5. The build agreement

    A written price after the drawings, with the schedule of payments tied to stages, and every allowance named.

  6. 06

    Step 6: 6. The build

    Utilities, foundation, framing, systems, finishes, inspections. One site lead is yours to call.

    Open wood framing with posts, beams and rafters of a new structure
  7. 07

    Step 7: 7. The walk-through

    We walk it with you, write down anything left, and finish it before the last payment.

Week one on site

What happens when the work starts

Before any digging, we call for the utility locates and mark the lot. A dumpster goes where it won't block the alley for long, and we tell the neighbors who share it. The first week is site protection, the trench and the layout of the foundation.

In week one

  • Utilities located and marked before the first shovel

  • Your yard and the way through it protected

  • A named site lead and a phone number for the crew

  • A plan for the alley and the dumpster

Floor trusses with metal connector plates stacked in a row

Living next to it

What a build site asks of you

You stay in the house. These are the things that change.

  • Noise and dust

    Saws and the trench are the loud days. We tell you which days before they happen, and we keep dust out of your house.

  • The yard

    Part of it becomes a work site. We mark what stays, protect it, and put back what we move.

  • The alley

    Deliveries and the dumpster use it. We warn the neighbors, and we keep it passable.

  • Water and power

    Connecting a new building means shutting something off for a short time. You'll hear when and how long.

Questions

Questions about the work

Can I live in the house during the build?

Yes. The work is outside your house, apart from the connections for water, power and sewer. We tell you ahead when something will be off.

Who will be on my property?

Our own crew, and the trades we bring in for electric and plumbing. Your site lead introduces them, and every visit is on the schedule you get.

What if the city asks for changes?

We answer the city's comments with the designer. If an answer changes the scope, we write a change order first.

How do inspections work?

The city inspects at set stages, and we book each one. Work doesn't get covered until it passes.

Start with a lot check

It comes before any agreement, and it commits you to nothing.