Skip to content
Planning spring starts now: a lot check in winter leaves time for permit review.
Monday – Friday: 7:30 a.m. – 4:30 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7:30 a.m. – 4:30 p.m.General contractor · CO Lic. no. 000000(720) 555-0103

Backyard cottages

A small house, built behind yours

A backyard cottage is a small, complete home with its own foundation, kitchen, bath and heat, set at the back of your lot. It is the longest utility run of the three kinds of work, and the one with the most freedom in the plan.

Included

  • Its own foundation, framed and insulated to code

  • A kitchen, a bath and a closet's worth of storage

  • Its own electric service from your panel or a new one

  • A porch or deck, if the lot's coverage allows

  • Water and sewer connected, with a cleanout

Small black board-and-batten cottage with large glass doors glowing at dusk

What changes the cost

What moves the price of this job

The cottage's price follows the lot as much as the plan.

  • The utility run

    Distance, depth and anything in the way: a tree, a patio, a neighbor's easement.

  • Foundation

    Frost depth and soil decide how deep the footing goes.

  • Size and shape

    Small houses cost more per square foot, because the kitchen and bath stay the same size.

  • Access

    An alley or a wide gate lets us bring materials. A narrow side yard means hand-carrying.

  • Windows and doors

    Large glass looks open and costs more than a wall.

  • Finishes

    Cabinets, floors and fixtures are allowances you choose.

Not included: furniture, landscaping, and city and utility fees

How it goes

The stages

  1. 01

    Step 1: 1. Lot check

    Zone, setbacks and the utility path.

  2. 02

    Step 2: 2. Walk the lot

    Where the cottage sits, and how we reach it.

  3. 03

    Step 3: 3. Drawings and permit

    A plan set, with a site plan on your plat.

  4. 04

    Step 4: 4. Site and foundation

    Locates, trench, footings and slab.

  5. 05

    Step 5: 5. Frame, systems and finishes

    Framing, roof, electric, plumbing and heat, then the inside.

  6. 06

    Step 6: 6. Walk-through

    Final inspection, then the keys.

Permits and rules

Permits and rules

A new house needs a building permit, and often a separate permit for each utility connection. The zone sets how large it may be, how tall, and how far it sits from each lot line and the alley.

Many cities also say who may live in it, and whether it can be rented. Those rules are the city's, and they change, so we confirm them with you at the lot check.

Questions

Questions about backyard cottages

How small can it be?

As small as the code allows for a dwelling. A cottage has to have a kitchen, a bath and a safe way out of every bedroom.

Can it share my utilities?

Often, but not always. A new service can be cheaper in the long run if your panel or sewer line is old.

Will it be seen from the street?

That depends on the lot and the rules. The zone may limit height, and the plan can set the cottage behind the house.

Is the house built before 1978?

If so, lead-safe practices apply to any paid work that disturbs paint on the old house, such as a new connection through a wall.

Does your yard have room?

The lot check comes first, and it commits you to nothing.